Critical Infrastructure · Hospitals · Data Centers · High-Rise

Your generator should be running before the lights go out.

SmartSwitch detects grid instability before voltage collapse and pre-starts your generator — seamless transfer, zero interruption.

Conventional ATS units wait for voltage to drop. SmartSwitch uses ROCOF analysis to detect grid stress before failure — and has your generator running before the transfer happens.

Photo: ATS Cabinet / Transfer Switch Panel
Product photo goes here

Conventional ATS units react. SmartSwitch predicts.

A standard ATS waits for voltage to drop below threshold before starting the generator. By then, servers have already crashed, medical equipment has already alarmed, and the building is in the dark. SmartSwitch detects grid instability in the frequency domain before voltage collapse — and pre-starts the generator while grid power is still on.

In South Florida, this is especially valuable during hurricane season, when grid instability precedes outages by minutes.

ROCOF analysis — detects grid instability before voltage collapse
Rate of Change of Frequency analysis identifies grid stress before conventional under-voltage protection fires. Seconds of warning = seamless transfer.
Pre-start logic — generator running before transfer
When instability is detected, the generator pre-starts. Transfer happens after the generator is at voltage and frequency — zero-interruption transfer.
Contact wear monitoring
ATS main and bypass contact resistance trending. Predicts contact replacement need before a failed transfer during an actual outage.

PLC safety layer. AI intelligence layer.

Edge HardwareNVIDIA Jetson + AutomationDirect Click Plus PLC safety layer
Grid AnalysisROCOF (Rate of Change of Frequency) · Voltage magnitude · Phase angle · Harmonic distortion
Pre-Start LogicPLC-controlled generator pre-start · Configurable lead time (5–60 seconds)
Transfer AnalysisTransfer time logging · Voltage/frequency at transfer · Sync quality score
Contact MonitoringContact resistance trending · Wear prediction · Replacement alert
Hurricane ModeAutomated pre-start on tropical storm/hurricane watch · Elevated monitoring mode
Data LoggingEvery transfer event logged with full telemetry · AWS cloud archival
IntegrationModbus RTU/TCP · Direct I/O to existing ATS control board
Kohler KCS/KCCCummins OTPCRusselectric RBTMZenith ZTSAsco Series 300/7000Generic open-transitionGeneric closed-transitionBypass isolation ATS
ATS Panel Photo
Open ATS cabinet showing contactors and controls

Ready to eliminate power transfer interruptions?

SmartSwitch overlays on your existing ATS. No new switchgear required. Installation typically one day.